How to Tile a Steam Shower

Lots of men and women enjoy relaxing at a spa, sauna or other area that offers warmth, a practice which dates back thousands of years. A modern iteration of the is really a steam shower, that is a steam room which doubles as a bathtub. The walls of showers and steam rooms are usually coated with ceramic tile since the tile is more impervious to water and easy to wash. You are able to put in the tile in your steam shower and spend less on labour expenses.

Put a tile contrary to the base of the wall on the outer edge of the side wall which does not contain the chair. (The”side walls” are decided by standing outside of the shower area and looking to it.) Mark the edge of the tile onto the cement backerboard. Repeat this every 12 inches round every wall of the steam shower. Connect the marks by drawing a line. Use a straightedge as a guide when doing this.

Mix a batch of thinset mortar, following the manufacturer’s directions.

Employ thinset to the wall beneath the line with a notched trowel. Use the smooth side of the trowel when dispersing the thinset onto the backerboard, then make a pass with the notched edge to make horizontal ridges from the thinset. Cover a place of the wall about 3 feet long and around a half-inch higher than the tiles you’re using.

Place the first tile to the thinset on the wall, pressing it firmly to the thinset.

Place tile spacers on the top edges of the tile. These keep a uniform difference around each tile which may be full of grout after the tiles are set.

Install tiles along the base edge of the walls. Cut tiles with a wet saw or tile cutter if needed. Measure the distance between the outer edge of the final tile spacer and the corner of the wallsocket. Mark a line on the tile you need to cut that matches which dimension and cut the tile along online. Wear safety goggles when cutting on the tiles. Let the tiles to place from the thinset for the time given by the manufacturer.

Tile the remaining first wall, using the same way you used when setting the initial class. Allow the tiles set for the time given by the manufacturer. When you reach places where fasteners or pipes for fittings stretch out of the wall, then measure the space between the encompassing tile spacers along with the obstruction. Mark the rough location of the barrier onto the back of the tile. Lock the tile down on a workbench. Apply water to the rear of the tile and the blades of a hole saw to reduce friction and protect the tile. Drill a hole to the tile with the hole saw. If the saw begins to jam up, or dry debris and dust from the tile starts to kick up, stop drilling and apply more water to the hole saw and tile. The tile can then be slid over the barrier through the hole you cut, providing a smooth appearance. Wear safety goggles while using the hole saw.

Install the tile on the rear wall of the shower. Set the initial course of tiles along the base of the wall and allow this to place, as you did with the first wall. Finish setting the tiles on the rest of the wall, using the identical way you used when completing the initial wall.

Set the initial course of tiles along the base edge of the chair as if you did with the other two walls.

Install V-caps along front of the chair. These are tiles formed at a 90-degree angle and are frequently used along front edge of a counter. Utilizing them along the edge of the chair can prevent individuals who sit at the steam shower in getting cut by the edges of the tiles. Employ thinset to the upper edge of the chair, covering an area about a wider wider than one facet of the V-cap. Apply silicone adhesive on the rear of the part of the V-cap which will be put along the front edge of the chair. Put the V-caps into position along the front edge of the chair, with tile spacers between them.

Tiles of the wall on the rest. The practice is just like the other two walls, but break it down into three segments: between the row of tiles along the base of the wall and the base of the V-caps; between the surface of the V-caps along with the wall (the top of the chair ); along with the wall between the chair and the ceiling.

Construct braces for the ceiling tiles by simply nailing 2-by-4 boards together in the shape of the letter”T”. Figure out the height of the foundations by measuring the space between the ceiling and floor, and subtracting the thickness of the ceiling tiles, the thickness of the 2-by-4 boards (approximately 1 1/2 inches) along with an extra quarter-inch so you have space to put in the dentures. Build one brace for each row of tiles on the ceiling.

Employ thinset to the rear of the tile. Put it against the ceiling in one corner, pushing it firmly against the ceiling and twisting it as you push it to guarantee a better grasp. Install the remaining tiles in that row, maintaining them with tile spacers.

Put the first brace into position beneath the tiles, with all the”T” in a vertical position. Put in a shim underneath the bottom of the brace to tighten the top edge against the tiles, if necessary.

Install the rest of the ceiling tilesusing the same procedure you used when setting the initial row. Keep the braces in place for 24 hours while the mortar sets.

Apply grout to the walls with a grout float. Begin at the base of each wall, and work toward the surface of the wallsocket. When applying the grout, run the grout float diagonally over the tiles, and make several moves before continuing on to another section to make certain that the gaps between the tiles are completely full of grout. Remove the tile spacers with needle-nose pliers as you come across them. Allow the grout to set for the time given on the packaging.

Wash the grout from the tiles by wiping them down with a moist sponge. As you do this, rinse the sponge.

Wipe the hazy film from the tiles with paper towels.

Apply grout sealer to the grout between the tiles. The grout sealer can be applied with a brush or by spraying it. Begin in one corner of a wall or ceiling, and put on the grout sealer to the grout lines between the tiles. Excess grout sealant from the face of the tiles as you go. Continue reading until the steam shower has been finished. Allow the grout sealer to place for one hour and apply another coat. This can be a tedious task, but shields the grout including growth of mould and bacteria.

See related